47 Braintree Business Park, Blackwell Drive

Braintree, ESSEX, CM7 2PU

  • White Facebook Icon
  • White Twitter Icon
Send us a message

© 2019 Solar Graphics (GB) Ltd

Project : Houses of Parliament.

July 27, 2017

With most businesses there are one or two projects or jobs that always stand out from the rest and are more memorable. We have been quite fortunate here where we get involved in a lot of special and memorable projects.

 

We thought we'd share this installation from our archives. This particular install was entrusted to us from a long standing client. The brief was to produce a set of laser-cut, 6mm thick stainless steel letters which would form part of the entrance to the Houses of Parliament Visitors Centre.

Each letter was laser-cut and then peened to match the new steel frames for the entrance gates. Each letter was then fitted with steel threaded studs and drilled into the existing beams.

 

We are very proud to work on projects like this and enjoy the challenges that arise from producing signage for such high profile projects.

 

 

 

 

Share on Facebook
Share on Twitter
Please reload

FEATURED POSTS

Sweet smell of success.

March 21, 2017

1/1
Please reload

RECENT POSTS

September 12, 2018

December 11, 2017

October 12, 2017

April 4, 2017

Please reload

ARCHIVE